$user = $this->Session->read('Auth.User');
//find the group of logged user
$groupId = $user['Group']['id'];
$viewFile = '/var/www/html/newbusinessage.com/app/View/Articles/view.ctp'
$dataForView = array(
'article' => array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
[maximum depth reached]
)
),
'Slider' => array()
),
'current_user' => null,
'logged_in' => false
)
$article = array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
'article_id' => '16837',
'hit' => '766'
)
),
'Slider' => array()
)
$current_user = null
$logged_in = false
$image = 'https://old.newbusinessage.com/app/webroot/img/news/20230125121853_20220926014301_road.jpg'
$user = null
include - APP/View/Articles/view.ctp, line 115
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117
Notice (8): Trying to access array offset on value of type null [APP/View/Articles/view.ctp, line 115]
$user = $this->Session->read('Auth.User');
//find the group of logged user
$groupId = $user['Group']['id'];
$viewFile = '/var/www/html/newbusinessage.com/app/View/Articles/view.ctp'
$dataForView = array(
'article' => array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
[maximum depth reached]
)
),
'Slider' => array()
),
'current_user' => null,
'logged_in' => false
)
$article = array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
'article_id' => '16837',
'hit' => '766'
)
),
'Slider' => array()
)
$current_user = null
$logged_in = false
$image = 'https://old.newbusinessage.com/app/webroot/img/news/20230125121853_20220926014301_road.jpg'
$user = null
include - APP/View/Articles/view.ctp, line 115
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117
Notice (8): Trying to access array offset on value of type null [APP/View/Articles/view.ctp, line 116]
//find the group of logged user
$groupId = $user['Group']['id'];
$user_id=$user["id"];
$viewFile = '/var/www/html/newbusinessage.com/app/View/Articles/view.ctp'
$dataForView = array(
'article' => array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
[maximum depth reached]
)
),
'Slider' => array()
),
'current_user' => null,
'logged_in' => false
)
$article = array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
'article_id' => '16837',
'hit' => '766'
)
),
'Slider' => array()
)
$current_user = null
$logged_in = false
$image = 'https://old.newbusinessage.com/app/webroot/img/news/20230125121853_20220926014301_road.jpg'
$user = null
$groupId = null
include - APP/View/Articles/view.ctp, line 116
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117
$viewFile = '/var/www/html/newbusinessage.com/app/View/Articles/view.ctp'
$dataForView = array(
'article' => array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
[maximum depth reached]
)
),
'Slider' => array()
),
'current_user' => null,
'logged_in' => false
)
$article = array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
'article_id' => '16837',
'hit' => '766'
)
),
'Slider' => array()
)
$current_user = null
$logged_in = false
$image = 'https://old.newbusinessage.com/app/webroot/img/news/20230125121853_20220926014301_road.jpg'
$user = null
$groupId = null
$user_id = null
$date = '2023-01-25 12:18:16'
$dateFromDatabase = (int) 1674628396
$newDate = 'Jan 25, 2023'
$articleView = array(
'article_id' => '16837',
'hit' => '766'
)
$word_count = (int) 681
$time_to_read = (float) 3.41
$time_to_read_min = (float) 3
$time_to_read_second = (float) 25
include - APP/View/Articles/view.ctp, line 241
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117
January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.
The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.
According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment.
Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.
The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory.
A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons.
“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.
Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality.
An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.
The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project.
The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased.
As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company.
The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).
FormHelper::create() - CORE/Cake/View/Helper/FormHelper.php, line 383
include - APP/View/Articles/view.ctp, line 273
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117
$viewFile = '/var/www/html/newbusinessage.com/app/View/Elements/side_bar.ctp'
$dataForView = array(
'article' => array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
[maximum depth reached]
)
),
'Slider' => array()
),
'current_user' => null,
'logged_in' => false
)
$article = array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
'article_id' => '16837',
'hit' => '766'
)
),
'Slider' => array()
)
$current_user = null
$logged_in = false
include - APP/View/Elements/side_bar.ctp, line 60
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::_renderElement() - CORE/Cake/View/View.php, line 1224
View::element() - CORE/Cake/View/View.php, line 418
include - APP/View/Articles/view.ctp, line 391
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117
Warning (2): simplexml_load_file() [<a href='http://php.net/function.simplexml-load-file'>function.simplexml-load-file</a>]: I/O warning : failed to load external entity "" [APP/View/Elements/side_bar.ctp, line 60]
$viewFile = '/var/www/html/newbusinessage.com/app/View/Elements/side_bar.ctp'
$dataForView = array(
'article' => array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
[maximum depth reached]
)
),
'Slider' => array()
),
'current_user' => null,
'logged_in' => false
)
$article = array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
'article_id' => '16837',
'hit' => '766'
)
),
'Slider' => array()
)
$current_user = null
$logged_in = false
simplexml_load_file - [internal], line ??
include - APP/View/Elements/side_bar.ctp, line 60
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::_renderElement() - CORE/Cake/View/View.php, line 1224
View::element() - CORE/Cake/View/View.php, line 418
include - APP/View/Articles/view.ctp, line 391
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117
file not found!
Notice (8): Undefined variable: file [APP/View/Elements/side_bar.ctp, line 133]
$viewFile = '/var/www/html/newbusinessage.com/app/View/Elements/side_bar.ctp'
$dataForView = array(
'article' => array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
[maximum depth reached]
)
),
'Slider' => array()
),
'current_user' => null,
'logged_in' => false
)
$article = array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
'article_id' => '16837',
'hit' => '766'
)
),
'Slider' => array()
)
$current_user = null
$logged_in = false
$xml = false
include - APP/View/Elements/side_bar.ctp, line 133
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::_renderElement() - CORE/Cake/View/View.php, line 1224
View::element() - CORE/Cake/View/View.php, line 418
include - APP/View/Articles/view.ctp, line 391
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117
Warning (2): simplexml_load_file() [<a href='http://php.net/function.simplexml-load-file'>function.simplexml-load-file</a>]: I/O warning : failed to load external entity "" [APP/View/Elements/side_bar.ctp, line 133]
$viewFile = '/var/www/html/newbusinessage.com/app/View/Elements/side_bar.ctp'
$dataForView = array(
'article' => array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
[maximum depth reached]
)
),
'Slider' => array()
),
'current_user' => null,
'logged_in' => false
)
$article = array(
'Article' => array(
'id' => '16837',
'article_category_id' => '1',
'title' => 'Narayangarh-Butwal Road Expansion Sees Dismal Progress ',
'sub_title' => '',
'summary' => 'January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.',
'content' => '<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">January 25: The widening of Narayangarh-Butwal road section along the East-West Highway has so far made only 23 percent progress with less than eight months left for the extended deadline to expire.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The road widening project was supposed to be completed by August 2022 but the progress remains dismal even though it has been four years since the project started.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">According to the China State Construction Engineering Corporation Limited, which is undertaking the expansion work, the widening of the road has been delayed due to complications brought out by COVID-19, tree felling, relocation of electric poles and mobilization of equipment. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Meanwhile, the Department of Roads had earlier concluded that the work was delayed due to the non-cooperation of the government, construction companies and local municipalities.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department had even sought explanation from the Chinese construction company -- China State Construction Engineering Corporation Limited – as the progress was not satisfactory. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">A team of experts from the DoR led by Director General Arjun Jung Thapa had visited the site for inspection in early November and deduced that the construction was delayed due to three main reasons. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">“It was seen that there was a delay in the work to be done by the Nepal government as well. The local municipality prohibited on buying of construction materials like aggregates, gravel and soil despite paying royalty to the local municipality. In addition, there were problems with the management of the construction company, leading to the delay in completion of wok on time,” Thapa had told New Business Age in an earlier interview.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">Even now, the electric poles on the road that needs to be widened have not been removed. Thapa said that he did not get any help from the local municipality. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">An agreement was reached between the Department of Roads and the Chinese company to complete the 114 km Narayangadh-Butwal road upgrading work in 3.5 years in January 2018.</span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The 114 kilometres of road stretch was divided in two sections while awarding the contract through a global bidding process. The China State Construction Engineering Corporation Limited had won the tender bids of both sections considering its proposal to construct the road section at the minimum base rate. However, several complaints have been received on part of the construction company regarding the dillydallying of the project. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The department earlier warned to terminate the contract arguing that the travelers and vehicles have faced several issues including difficulties in travel, air pollution and others problems due to carelessness of the construction company. The locals in the affected area have also suffered while road accidents have increased. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">As the contract agreement ended on August 7, the government has extended the deadline for one more year at the request of the construction company. </span></span></p>
<p><span style="font-size:18px"><span style="font-family:Calibri,"sans-serif"">The expansion of this road section is estimated to cost around Rs 16 billion. The project is running with concessional loan provided by the Asian Development Bank (ADB).</span></span></p>
<p> </p>
',
'published' => true,
'created' => '2023-01-25',
'modified' => '2023-01-25',
'keywords' => '',
'description' => '',
'sortorder' => '16577',
'image' => '20230125121853_20220926014301_road.jpg',
'article_date' => '2023-01-25 12:18:16',
'homepage' => false,
'breaking_news' => false,
'main_news' => true,
'in_scroller' => null,
'user_id' => '34'
),
'ArticleCategory' => array(
'id' => '1',
'name' => 'NEWS',
'parentOf' => '0',
'published' => true,
'registered' => '2015-07-20 00:00:00',
'sortorder' => '158',
'del_flag' => '0',
'homepage' => true,
'display_in_menu' => true,
'user_id' => '1',
'created' => '0000-00-00 00:00:00',
'modified' => '2018-11-22 11:58:49'
),
'User' => array(
'password' => '*****',
'id' => '34',
'user_detail_id' => '1',
'group_id' => '1',
'username' => 'neeraj.roy@newbusinessage.com',
'name' => null,
'email' => 'neeraj.roy@newbusinessage.com',
'address' => null,
'gender' => null,
'access' => '1',
'phone' => null,
'access_type' => null,
'activated' => true,
'sortorder' => null,
'published' => null,
'created' => '2020-07-19 16:40:23',
'last_login' => '2024-08-13 13:55:06',
'ip' => '172.69.41.137'
),
'ArticleComment' => array(),
'ArticleFeature' => array(),
'ArticleHasAuthor' => array(),
'ArticleHasTag' => array(),
'ArticleView' => array(
(int) 0 => array(
'article_id' => '16837',
'hit' => '766'
)
),
'Slider' => array()
)
$current_user = null
$logged_in = false
$xml = false
simplexml_load_file - [internal], line ??
include - APP/View/Elements/side_bar.ctp, line 133
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::_renderElement() - CORE/Cake/View/View.php, line 1224
View::element() - CORE/Cake/View/View.php, line 418
include - APP/View/Articles/view.ctp, line 391
View::_evaluate() - CORE/Cake/View/View.php, line 971
View::_render() - CORE/Cake/View/View.php, line 933
View::render() - CORE/Cake/View/View.php, line 473
Controller::render() - CORE/Cake/Controller/Controller.php, line 968
Dispatcher::_invoke() - CORE/Cake/Routing/Dispatcher.php, line 200
Dispatcher::dispatch() - CORE/Cake/Routing/Dispatcher.php, line 167
[main] - APP/webroot/index.php, line 117